Introduction
Oregon Revised Statutes 459 requires that solid waste treatment facilities apply to DEQ for a Solid Waste Disposal Permit prior to starting operation.
Application process
The following documentation must be submitted in writing to DEQ in order for the permit application to be complete. There has to be a clear demonstrated need for the proposed new, modified or expanded disposal site or for the proposed change in the method or type of disposal.
A complete application should include the following items:
- Items 23 through 28 on the permit application
As a reminder these items are listed below:- Completed and signed Land Use Compatibility Statement
- Written recommendation from the local solid waste planning authority
- A Certificate of Business Registry
- Identifications of any other known or anticipated permits
- Application fee and compliance fee (if required)
- Any other information DEQ deems necessary
- Detailed plans and specifications
Details to be included in the plans and specifications are described below. The types of plans used to describe the site specific facility information are as follows:- Design and Construction Plans are used to show how the facility will be designed and constructed. The details to include in the plan are described below.
- Operational Plans are used to show how the facility will be operated. The details to be included in the operational plan are described below.
- Site Closure Plan is used to show how the facility will be closed in a manner that protects the environment and human health. The details to be included in this plan are described below.
Detailed plans and specifications